j
k
j a
j l
== Progress == * Setup 5.0.1 Spreadtrum member build (35 %) * Setup optimus a80 member build (35%) * Project ARA ( 30%)
== Plans == * Project ARA * Debug LAVA job failure for a80 build.
Regards, Vishal
Attachments:
Back to the thread
Back to the list