j
k
j a
j l
== Progress == * meta-luv work (30%) * OE CI loops (10%) * Connect preparations (10%) * ELC-E preparation (10%) * Release preparations (30%) * meta-96boards maintenance (10%)
== Plans == * vacation
Back to the thread
Back to the list