j
k
j a
j l
== Progress == * Connect wrap up in jira (20%) * ELC-E preparation (40%) * Release fixes (5%) * meta-96boards maintenance (5%) * OE builds (30%)
== Plans == * ELC-E
Back to the thread
Back to the list